FIELD SUITE ENVIRONMENTAL CONSULTING

5 Microns, Inc.

Efficiency of a Full Team — From a Solo Operation

Environmental Consultingerblue Field Suite
10 min REPORT TIME — DOWN FROM 1 HOUR
3 – 4 INSPECTIONS/DAY — UP FROM 2–3
≈ 0 ADMINISTRATIVE FOLLOW-UP BURDEN

THE SITUATION

Pascal Jean-Baptiste runs 5 Microns as a solo environmental consulting operation. Manual reporting and administrative follow-ups were a hard ceiling on what one person could accomplish in a day. Report assembly alone took an hour per project. At 2–3 inspections per day, a significant portion of every workday was paperwork, not fieldwork.

THE DEPLOYMENT

erblue Field Suite adopted to digitize the full inspection and reporting workflow.

THE RESULT

Report time reduced from 1 hour to 10 minutes. Inspection capacity increased from 2–3 to 3–4 per day. Administrative work cut to near zero, and capacity up to 3 to 4 inspections a day.

"erblue gave me the efficiency of a full team. I can now focus on growing the business, not catching up on paperwork."

See what's possible
for your operation.

WANT RESULTS LIKE THESE?

Evaluation begins with your documents and your constraints. No generic demos.

REQUEST A DEMO →