FIELD SUITE ENVIRONMENTAL CONSULTING

Lead Consultants of America

80% Less Time on Report Drafting

Environmental Consultingerblue Field Suite
80% REDUCTION IN REPORT PREPARATION TIME
10 min REPORT TIME — DOWN FROM 1–2 HOURS
Same day TURNAROUND — DOWN FROM 2–3 DAYS
<2 wks FULL TEAM ADOPTION

THE SITUATION

Lead Consultants of America is a growing environmental consulting firm managing multiple concurrent projects. Their most experienced staff were spending a disproportionate amount of time assembling reports rather than doing the analytical work that differentiated the firm. Legacy inspection tools created inconsistency across inspectors, slowed reporting, and limited the firm's ability to scale.

THE DEPLOYMENT

erblue Field Suite deployed to replace legacy tools and standardize reporting across the full inspector team.

THE RESULT

An 80% reduction in report preparation time. LCA can now take on more projects with the same team.

"We can now handle more projects without hiring additional staff, an 80% reduction in report preparation time."

See what's possible
for your operation.

WANT RESULTS LIKE THESE?

Evaluation begins with your documents and your constraints. No generic demos.

REQUEST A DEMO →